One of our recent jobs was within a Pharmaceutical manufacturers clean room environment, providing linear seals and penetration sealing to services entering the lift shaft.
Working within strict guidelines for accessing the clean area with all the materials, we had to adopt a detailed work method and waste management plan to make sure there was no cross contamination when transiting the areas. We completed the 4 large goods lift entrances along with the head of wall trapezoid seals and 2 service penetrations within the first visit. we will return at the end of the install to check all seals, and finish the last cable entry seal before completing the comprehensive report.
Obviously the main work area was hoarded off and clear of the need for clean room status during the project, but all of the work area was thoroughly cleaned before we left to move to the next floor. It was important to keep the cutting to a minimum, and to keep all waste bagged ready for removal.
Our client was very happy with the planned approach and the attention to detail taken from the survey through to quote and delivery. we hope to be back working there again soon in the future!