As the sun was breaking through the Leeds skyline we were happy to see the next challenge for Triniti3 to solve! The client had reported some compliance concerns for the next phase of lift entrance linear seals, and both time and space was tight. The programme didn’t have any slack to wait for a long drawn out approval process, so we jumped into action to carry out a full site measure, and gain a full understanding on what we are working with.
Luckily in this case there is enough clearance on both sides of the entrance frame to allow the installation of the linear batt and mastic detail that we recently tested in partnership with Firefly.
A full report and follow up meeting has clarified the options for our client, and we hope to be back on site very soon to provide the full solution. From survey to design confirmation and then the installation, problem solving in action. The skyline in Leeds is changing every day, so we are excited to be part of the future for the North East & Yorkshire