Cleanroom Fire Protection

One of our recent jobs was within a Pharmaceutical manufacturers clean room environment, providing linear seals and penetration sealing to services entering the lift shaft. Working within strict guidelines for accessing the clean area with all the materials, we had to adopt a detailed work method and waste management plan to make sure there was … Continued

Stage one of a refurbishment

We recently completed this first stage of work for a major developer who has a project to complete a 5 floor conversion to from office to residential. As this was the first job we have completed for them, we were given the first 5 show flats to carry out the penetration seals. Thankfully the QS … Continued

The ‘Lofty’ Heights of Fire Stopping!

This has been a challenging project to complete in the midst of summer, but the client is an very busy high school so needed to keep the refurbishment works within the boundaries of the school holiday period. The project included just under 20 head of wall partition sealing details, along with multiple cable and pipe … Continued

Return to site for repeat works

We were very happy to be asked to return to a previous job site this week to complete the next phase of works. Our client was happy with the speed of turnaround from survey to delivery, and the level of communication maintained throughout. This allowed them to schedule other works and visits by associated trades, … Continued

Back to School!

We had to pull on our robes and mortar board again recently following a repeat order from one of our clients during work at a local university. Having completed passive fire protection to the linear gaps around the lift entrances on a previous order, our client asked us to return and improve the shaft integrity … Continued

Firas Accreditation Passed!

We have been following the accreditation pathway with Warrington Fire/Firas over the last 6 months and are pleased to report a pass and acceptance to become members. The process started with a thorough check on the back office procedures and data control for reports and archives, then followed on to site audits on workmanship and … Continued

New Client and 2 new Jobs Completed

Following a meeting with a prospective new client last week we were asked to assist with helping them close out on two projects before the Christmas break. The timing needed to be immediate to prevent any delay to their lift commissioning works, so no time to waste. Rather than spending time attending to survey, we … Continued

Another Joint Project Completed!

We have recently completed another joint project with our sister company, Castle Eden Fabrications, where we provided the fire stopping solution for the newly fitted entrances and cable entries closely followed on by Castle Eden installing made to measure Architraves to each floor. This joint approach provides a smooth transition for the lift installers as … Continued

New Project Completed in Newcastle

Following a call from a new client for advice on solutions for fire stopping after lift entrance replacements, we visited site to survey and provide solutions to their problem. Thankfully the advice was taken on board, and an order was given to seal the entrances and in addition to provide them with bespoke measured and … Continued

Triniti3 Group Joins the Industry Mental Health Charter

It is with great pride that we have chosen to add our support to the fantastic initiative being mobilised within our Lift Industry to raise awareness on Mental Health and the associated issues. The stigma attached to all matters of mental health, especially within males who may feel it is a sign of weakness to … Continued